Renewable Energy Sources

Hybrid Power Stations

(in progress)

Currently we are developing Hybrid Power Stations on 14 small Greek Islands, consisting of 24.4 MWp RES (Photovoltaic) capacity combined with 64.2 MWh Lithium-Ion Batteries Storage capacity respectively

NEANDROS provides the following services:

  • Market research, feasibility study, Business Plan
  • Design & Engineering
  • Licensing
  • Project Management
  • Commissioning
  • Operation & Maintenance

Wind & PV Power Stations (completed)

In the field of Renewable Energy Sources (RES), NEANDROS has developed on behalf of its customers:

Photovoltaic Parks (2011), with a total power of 7.5MWp:
  • Thebes I 100KWp
  • Thebes II 1.2 MWp
  • Thebes III 1.8 MWp
  • Thebes IV 3MWp
  • 15 smaller parks with a total capacity of 1.4 MWp.

Wind Farms (2007), with a total capacity of 63.6MW:
  • WP Zarakes I, power 3.0MW, in Evia.
  • WP Zarakes II, power 28.8MW, in Evia.
  • WP Epanosifis, power 6.3MW, in Crete.
  • WP Antirrio, power 28.8MW, in Etoloakarnania.